When I was an independent contractor, most of my clients insisted on an
hourly billing structure with a maximum total. In the negotiation
process, I had only to determine whether or not I could do the job for
less than the maximum. My clients were happy because I never hit the
maximum. I was happy because I was certain to always make a profit.

The exception to this billing structure was for business-to-business
video scripts I wrote. I wrote those on a fixed amount, based on the
number of minutes and complexity of the presentation. For some scripts,
I made as much as $75/hr, and for others, as little as $10/hr. In the
end, it was a wash; I might just as well have charged by the hour--had
the customer allowed this.

Cheers.

-Mike

--
Michael Andrew Uhl (mailto:uhl -at- vislab -dot- epa -dot- gov)
Lockheed Martin - U.S. EPA Scientific Visualization Center
Ph. (office) 919.541.4283; 919.541.3716 (lab)
P.O. Box 14365 Research Triangle Park, NC 27709

From ??? -at- ??? Sun Jan 00 00:00:00 0000=




Previous by Author: Re: Some Advice Needed
Next by Author: What to do in slack times?
Previous by Thread: Re: Guesstimate THIS! (was RE: Contracting Experiences
Next by Thread: Copyrights for Templates Re: Styles for User Guides [longish]


What this post helpful? Share it with friends and colleagues:


Sponsored Ads